School Project 5

Project area:

  • The total area of the original classroom is about 140 square meters;
  • Grooming teaching area is about 73 square meters, bathing teaching area is about 29 square meters (including a small foster area)
  • The teaching area of cat Grooming is about 38 square meters;
  • Equipment budget: USD 36,000 (excluding the construction costs of water and electricity transformation, classroom partition, etc.);

 

Grooming teaching area:

  • 1 teacher station + 1 assistant teacher station + 36 student working stations;
  • Bath teaching area: 2 spa teaching station + 8 bathing teaching stations + 1 set of large drying equipment;
  • Cat Grooming teaching area: 2 teacher station + 4 student working stations + 4 sets of cat drying equipment;
  • Estimated power consumption: the power consumption of teaching equipments is about 98kW, and that of air conditioning, lighting, water heater is about 45kW.

 

Figure 1 (front view)

Figure 2 (front view)

Figure 3 (overall perspective)

Figure 4 (overall perspective)

Figure 5 (perspective view of wet area)

Figure 6 (3D rendering of beauty teaching area)

Figure 7 (3D rendering of beauty teaching area)

Figure 8 (3D rendering of bathing teaching area)

Figure 9 (3D rendering of Cat grooming teaching area)

This category is empty! Please try another category or use our search function to find what you are looking for. If you require further assistance please contact us.