School Project 2

Project area:

  • The total area of the original classroom is about 168 square meters;
  • Grooming teaching area is about 56 square meters, bathing teaching area is about 56 square meters (including a small foster area)
  • The teaching area of cat Grooming is about 56 square meters;
  • Equipment budget: USD 95,000 (excluding construction costs of water and electricity transformation, classroom partition, etc.);

Working station:

  • Grooming teaching area: 1 teacher station + 1 assistant teacher station + 30 student working stations;
  • Bath teaching area: 1 spa teaching station + 8 bathing teaching stations + 1 set of large drying equipment;
  • Cat Grooming teaching area: 1 teacher station + 1 assistant teacher station + 18 student working stations
  • Estimated power consumption: the power consumption of teaching equipments is about 70kW, and that of air conditioning, lighting, water heater is about 70kW.

 

Figure 1 (original drawing)

Figure 2 (front view)

Figure 3 (front view)

Figure 4 (overall perspective)

Figure 5 (overall perspective)

Figure 6 (3D rendering of Grooming teaching area)

Figure 7 (3D rendering of Grooming teaching area)

Figure 8 (3D rendering of bathing teaching area)

Figure 9 (3D rendering of bathing teaching area)

Figure 10 (3D rendering of cat Grooming teaching area)

This category is empty! Please try another category or use our search function to find what you are looking for. If you require further assistance please contact us.