School Project 1

Project area:

  • The total area of the original classroom is about 125 square meters;
  • It is divided into grooming teaching area of 96 square meters and bathing teaching area of 29 square meters;
  • Equipment budget: USD 40,000 (excluding the construction costs of water and electricity transformation, classroom partition, etc.);

 

Working station:

  • Grooming teaching area: 1 teacher station + 1 assistant teacher station + 35 student working stations;
  • Bath teaching area: 2 Spa teaching stations + 7 Bath teaching stations + 1 foster cage bank;
  • Estimated power consumption: the power consumption of teaching equipments is about 62kW, and that of air conditioners, lighting, and water heaters is about 35kW.

.

Figure 1 (original drawing)

Figure 2 (front view)

Figure 3 (front view)

Figure 4 (overall perspective)

Figure 5 (perspective view of grooming teaching area)

Figure 6 (perspective view of wet area)

Figure 7 (3D rendering of grooming teaching area)

Figure 8 (3D rendering of grooming teaching area)

Figure 9 (3D rendering of bathing teaching area)

Figure 10 (3D rendering of bathing teaching area)

This category is empty! Please try another category or use our search function to find what you are looking for. If you require further assistance please contact us.